The Solar Process

While solar panels can pay for themselves over the long run, there are many solar incentives that can greatly shorten the time and increase your return on investment. These benefits are great, but keep in mind, they benefit the owner of the solar system, so if you are leasing your system, you are not the owner and therefore do not receive these benefits.

1

Solar Site Assessment

A trained, professional solar energy consultant will visit the site, gather information, and answer questions. This will include assessing current and future usage, getting a copy of the electric bill, and taking pictures of the roof and surrounding property, the electric meter, electric panel, and interior condition of the roof if applicable. We complete most assessments in about 30 minutes.

2

Design

We review your site and create engineering designs specific to your home or business. Designs are typically ready in a few days.

3

Presentation of Custom Solutions

We will meet with you to review the design and explain any options or questions which typically include a timeline, payback, financing, etc. Once we have a signed contract and deposit, we will start the process which, from start to finish, is typically 12 to 20 weeks. There’s a lot to accomplish before the first panel goes up.

4

Applications -

If applicable, we always recommend informing the HOA of the solar installation.
Energy Select submits Inter-Connection (IC) documents to the electric utility.

Energy Select submits stamped engineered designs and applications for county permits

5

Schedule Installation

With all the paperwork in hand, we are ready to schedule the installation at a convenient time for you.

6

Install Days

Since so much pre-engineering is done, our in-house professional installers will typically finish in 2 to 3 days.

7

Final Inspections

Once installed, our North American Board of Certified Energy Practitioners (NABCEP) certified engineer will visit for a quality inspection and then call for a final county inspection. County Electrical Inspection – The county will inspect the electrical work. Utility Inspection – The final inspection comes from the local utility.

8

Utility Permission to Operate (PTO)

After the green stickers (passing inspections) we will switch over to your new power source and begin saving money and the planet!

2

Design

We review your site and create engineering designs specific to your home or business. Designs are typically ready in a few days.

4

Applications -

If applicable, we always recommend informing the HOA of the solar installation.
Energy Select submits Inter-Connection (IC) documents to the electric utility.

Energy Select submits stamped engineered designs and applications for county permits

6

Install Days

Since so much pre-engineering is done, our in-house professional installers will typically finish in 2 to 3 days.

8

Utility Permission to Operate (PTO)

After the green stickers (passing inspections) we will switch over to your new power source and begin saving money and the planet!

Get a Quote

We're excited to get to know you and your project.